Demo

Ninefold Kitchens is a demonstration build by Orabeam. The company is fictional and has no projects, reviews or licence. Every cost and resale figure on this page comes from a published industry study and is cited.

Charlotte · Mecklenburg & Union County

A major kitchen remodel gets you back about half your money.

Nobody in this trade puts that on their homepage. It is the headline finding of the industry’s own annual report, and knowing it is the difference between a kitchen you chose and a kitchen you were sold. Work out your real number below, then decide.

Free · No email required · Every figure sourced to Zonda or Houzz and linked

112.9% recouped by a minor kitchen remodel — the only interior project in the national top five, ahead of every other room in the house. Zonda, 2025 Cost vs. Value Report (38th annual, 119 markets)
50.9% recouped by a major midrange remodel. $82,793 spent, about $42,130 back. The other half buys you the kitchen, not an asset. Zonda, 2025 Cost vs. Value Report
25% of renovating homeowners are doing it for resale value at all. 41% simply cannot stand the old kitchen; 35% have one that broke down. 2025 U.S. Houzz Kitchen Trends Study (n = 1,620)

Where these numbers come from

  1. Zonda, 2025 Cost vs. Value Report — 38th annual edition, published 18 September 2025, 119 U.S. markets and 28 project types; costs from Verisk XactRemodel®, resale values from surveys of real estate professionals.
  2. Houzz, 2025 U.S. Kitchen Trends Study — 120-question survey of 1,620 homeowners, fielded 27 June to 30 July 2024.
  3. Canopy MLS / Canopy Realtor® Association — Charlotte region median sale price, $412,500 as of May 2026.

These are national industry figures, not our project results. Ninefold is a demonstration company with no completed jobs. Zonda does not publish a Charlotte-specific breakdown that we could verify at source, so the calculator uses national averages and says so.

The part the industry leaves out

Three things a remodeler’s website will not tell you

All three come from reports the industry publishes about itself. None of them is a secret. They are just inconvenient to whoever is trying to sell you the bigger package.

If a contractor quotes you a kitchen and talks about ROI, ask which report and which year. Half the “96% recouped” figures still circulating are from the 2024 edition.

The current number for a minor kitchen remodel is 112.9%, from Zonda’s 2025 report. The current number for a major midrange remodel is 50.9%. Both are on this page, with the source linked, because a number without a year and a source is decoration.
01

“Minor” does not mean cheap or small

Houzz’s definition, which we use: a major remodel replaces at least all the cabinets and all the appliances. Everything else is minor — and “everything else” includes new doors and drawer fronts on existing boxes, new counters, new backsplash, new lighting, new hardware, new paint. That is a kitchen that looks and works new, at a national median of $20,000 rather than $60,000.

02

Percentages don’t scale the way you’d think

Zonda publishes one cost point per project type — $82,793 for a major midrange kitchen. Multiplying its 50.9% by whatever number you have in mind implies a $200,000 kitchen returns half, exactly like an $82,793 one. It does not. Our calculator damps the return as spend rises, and labels that damping as our assumption rather than dressing it up as data.

03

Most people aren’t doing this for the money

Only 25% of renovating homeowners cite resale value. 41% cannot stand the old kitchen, 35% have one that has deteriorated or broken down, 33% say they have finally got the means. If you are in that group, the ROI table is the wrong tool entirely — and we would rather help you pick a kitchen than sell you a spreadsheet.

Interactive

What your kitchen actually costs

Set the four inputs. Everything updates instantly, itemised, with the source for each line. Nothing is sent anywhere — the whole model runs in your browser, and you can inspect and change every constant at window.NinefoldKitchen.model.

Your project

Starts at $412,500 — the Charlotte region median sale price as of May 2026 (Canopy MLS).
Kitchen size
Houzz splits its spend data at 250 square feet, so we do too.
Scope
Major replaces at least all cabinets and all appliances. Anything short of that is minor — including refacing, new counters, backsplash, lighting and paint. Houzz’s definitions, used verbatim.
Positions your project within the Houzz spend distribution rather than inventing a price list.
The input that changes the answer most, and the one no other calculator in this trade asks for.

Adjust the inputs to see the result.

Project cost $0
Back at resale $0
Net cost $0
Per year $0
Where the money goes
Of every dollar you spend, this is the split between what returns at sale and what buys you the kitchen
The working
Every line, with the study it comes from

    What this is. A budgeting model built on two published studies, not a quote and not an appraisal. Costs are national Houzz medians and 90th percentiles — Zonda does not publish a Charlotte-specific breakdown we could verify at source, so we do not pretend to have one. Resale figures are Zonda’s national averages; the curve that damps them as spend rises is our own conservative assumption, exposed in the model so you can change it. Your actual price depends on layout changes, structural and plumbing work, permitting, appliance selection and the condition of what is behind the drywall.

    What it is not. A promise about what your house will sell for. Cost vs. Value resale figures are estimates from surveys of real estate professionals, not matched transaction data.

    What we build

    Three scopes, priced honestly

    The ranges below are national Houzz spend figures for each scope, not our price list — a demonstration company has no price list to publish. On a live install these are replaced with the builder’s real numbers.

    Scope 01

    Refresh

    The scope Zonda’s data says is the best trade in the house. Existing cabinet boxes stay; everything you touch and look at is new. Four to seven weeks, and you keep using the room for most of it.

    • Cabinet refacing — new doors, drawer fronts, hardware
    • New countertops & backsplash
    • Sink, faucet, disposal
    • Lighting: recessed, under-cabinet, pendants
    • Paint, trim, flooring where needed
    $18K–$40K national range, small kitchen
    Scope 02

    Full remodel

    All cabinets and all appliances replaced — Houzz’s definition of “major”. Same footprint, so no structural or plumbing relocation. Ten to sixteen weeks. This is where the 50.9% recovery rate applies, and we will say so before you sign.

    • New cabinetry throughout, semi-custom or custom
    • Full appliance package
    • Stone or engineered countertops
    • Electrical brought to current code
    • Flooring, ventilation, finish carpentry
    $45K–$137K national range, small kitchen
    Scope 03

    Reconfigure

    Walls move. Plumbing and gas relocate. The kitchen becomes a different room, usually opening to living space. The scope where design fees, permits and structural engineering are real line items rather than afterthoughts.

    • Load-bearing wall removal with engineered beam
    • Plumbing, gas and electrical relocation
    • Mecklenburg County permitting & inspections
    • Structural engineering & drawings
    • Everything in Scope 02
    $72K–$200K national range, large kitchen
    Our work

    There are no photographs here yet

    This is a demonstration build for a company that has not built anything. Filling this section with stock photography of somebody else’s kitchens would be the single most common lie on a remodeler’s website, and we are not going to open with it. On a live install, these three slots hold real project photography with the address, scope and final cost.

    Also deliberately absent

    1. Reviews and star ratings. A company with no customers has no reviews. There is no Houzz badge, no “4.9 from 291 reviews”, no testimonial carousel.
    2. Licence and insurance numbers. A real North Carolina general contractor’s licence number belongs here and is verifiable through the NC Licensing Board. Inventing one would be worse than leaving it blank.
    3. Years in business and project count. Zero and zero.
    Process

    You know the real number before demolition, not during

    Walkthrough, ninety minutes, no charge

    We measure, we look behind what we can, and we ask how long you plan to stay. That last question decides more than the finish selections do. If the calculator above already told you a smaller scope is the better trade, we start there.

    A fixed price, with the allowances written out

    Every quote in this trade has allowances — a budget line for things you have not chosen yet, like tile or fixtures. Most quotes bury them. Ours lists each allowance with its number, so when you pick the $18/sq ft tile instead of the $9, you know exactly what happened to the total before you commit.

    A schedule with the ugly parts named

    Cabinet lead times, inspection windows, and the week the sink is out. Ten to sixteen weeks for a major remodel is realistic; anyone promising you a full kitchen in three weeks is either subcontracting it badly or has not read their own supplier’s lead times.

    Change orders in writing, before the work

    Opening a wall reveals things. When it does, you get the price before we proceed, not on the final invoice. This is the single largest source of complaints against remodelers, and it is entirely a paperwork discipline.

    Questions

    The ones people actually ask

    Will a new kitchen pay for itself?

    A minor remodel roughly does — Zonda’s 2025 report puts it at 112.9% recouped, the only interior project in the national top five. A major midrange remodel does not: 50.9%, meaning you keep the kitchen and lose about half the money. That is not an argument against doing it. It is an argument for doing it because you want the kitchen, and choosing the scope with your eyes open.

    Why do your prices look like national averages?

    Because they are, and we would rather say so. Houzz publishes national median and 90th-percentile spend by scope and kitchen size; that is the most defensible cost data that exists publicly. Zonda breaks its report down to 119 local markets, but the regional detail sits behind the full report and we could not verify a Charlotte figure at source, so we do not quote one. When this becomes a real company’s site, these ranges get replaced with its actual completed-project costs.

    What does “minor” actually include?

    Everything except replacing all the cabinets and all the appliances. In practice: refacing the cabinets you have, new countertops, new backsplash, new sink and faucet, new lighting, new hardware, paint, and flooring if it needs it. The room looks and works new. National median spend is $20,000 against $60,000 for a major remodel — and the resale recovery is more than twice as good.

    How much of my home’s value should I spend?

    There is a widely repeated rule of thumb of 5–15% of home value, and we could not trace it to a primary source, so the calculator treats it as a flag rather than a figure. What it does do: warn you when the project passes about 18% of your home’s value, because past that point buyers are pricing the street rather than the kitchen. On a Charlotte home at the regional median of $412,500, a national-median major remodel of $60,000 is about 15%.

    How long will we be without a kitchen?

    Four to seven weeks for a refresh, and you keep using the room for much of it. Ten to sixteen weeks for a major remodel, with roughly three of those weeks having no sink. Reconfiguring adds permitting and inspection time on top, which is scheduled by Mecklenburg County rather than by us.

    Can I see your reviews and past projects?

    No, and it matters that we say why. Ninefold is a demonstration company built by Orabeam to show what a real remodeler’s site should look like. It has no completed projects, no reviews, no licence number and no insurance certificate. Rather than fill those sections with stock photography and invented testimonials — which is standard practice in this trade — they are left visibly empty. Real project data goes here at build

    Get in touch

    Book the walkthrough

    Ninety minutes, no charge, no obligation. We will tell you on the day if a smaller scope is the better trade — that conversation costs us margin and saves you money, which is roughly the point.

    Shop Address added at company setup Demo build — no premises exist.
    Telephone Number added at company setup Deliberately not a plausible fake — real people dial numbers they find on live sites.
    NC contractor licence Licence number added at company setup Verifiable through the NC Licensing Board for General Contractors once real.
    Service area Charlotte, Matthews, Huntersville, Davidson, Waxhaw, Fort Mill

    Request a walkthrough

    Under a minute. We come back with two or three times that work.